Entrances to private property require work to be completed within Municipality road allowances (i.e. Municipal property). Central Elgin's Entrance By-law 2640 has been enacted to regulate the construction of new entrances and modifications to existing entrances. It provides standards and specifications, and will ensure consistent response to property owner requests.
Road Permits
The Municipality of Central Elgin has different permits to suit your needs for your projects and events. For information about fees, check the User Fee By-law.
Entrance Permits
You need an entrance permit before you make any modifications to an existing entrance or construction of a new entrance within the Municipality of Central Elgin's road allowance. Please refer to the Entrance Policy for more information.
Fees
There is a standard $222.50 non-refundable permit fee. Security deposits will vary depending on location and driveway entrance extents. All fees are in line with the User Fee By-law.
FAQs
Why is an Entrance Permit required?
- Creation of a new entrance to private property from the municipal road allowance
- Modification or relocation of an existing entrance (i.e. widening, new location, removal, etc.)
- Creation of a temporary entrance (for construction projects as an example)
- Paving or resurfacing an existing entrance.
How wide can I make my entrance?
The maximum width permitted for entrances depends on the property size, please refer to section 6 of the Entrance By-law for more details. The location of street fixtures (i.e. street lights, utility boxes, fire hydrants, etc) also dictate how wide the entrance can be.
How long does it take to get an entrance permit?
The Municipality requires a minimum of 5 business days once an application has been successfully submitted for review. Staff will be in contact with additional information once they've had a chance to review the submission. Timing may also depend on the status of other approvals that may be required. In general, please allow up to 30 business days for a permit to be issued.
Road Occupancy Permit
You need a road occupancy permit prior to commencing any work, project or bin storage located within the Municipality's road allowance (i.e. boulevard, sidewalk, and/or roadway). You cannot work or store material without first obtaining this permit. We evaluate each location individually.
Fees
There is a standard $115.25 non-refundable permit fee. All fees are in line with the User Fee By-law.
FAQs
When do I need a road occupancy permit?
Do I need insurance to work within the Municipality's road allowance?
How long does it take to get a road occupancy permit?
View the Latest News from Central Elgin